Tuesday, June 27, 2023

Small Fence, Big Difference (Part 1)

As they say on Letterkenny, "back to chorin'". Today's post covers our building a 7 meter (20 foot) fence between our new neighbor's fence and NewOldHouse. We did this entirely ourselves with all salvaged wood. The only new materials were the gate supports, hinges and latches. Since there are only 2 of us working on this, around jobs and such, it is taking a while, so this is split into multiple parts.

before image
Before I get into it, you are probably wondering why we did this when the kitchen is non-existent. Great question. It starts with the dog, Tuukka. He is very curious and wants to be in everything. We knick-named him "pedibus" because of how much he wants to be underfoot. So, if we need to get after some serious demo, or something, we need to contain him. The backyard is big and wild.. and almost completely enclosed with fence. The space between the neighbor's fence and our house is open, so when we put him in the backyard, we find him in the front shortly thereafter.

Get Material
Backing up a couple of months, Boo was out walking Tuukka when she saw a fencing company tearing down a neighbors fence. In her usual way, she asked what they were up to and what they were doing with the remains. It turned out some of the fence was bad, some of it was good, but the neighbor wanted the whole thing replaced. So, the fencing guys put the really bad stuff in their trailer and left the mediocre to good fencing in a pile on the curb. In 2 loads with ToyoTruck, we collected enough material to build more than what we needed. The main posts were not too great, so we will probably not re-use many of them. The cross-pieces are a mix also, but mostly in decent shape; many were recent replacement boards. Last, we look at the actual pickets. This fence was at least 5 feet high, and we are building a 4-foot fence. So, any board which has limited rot on the bottom is fair game. Some boards were in good shape, but most have some rot at the bottom and the top is worn.  Again, if we can get 4 feet out of a board, it fits our purpose. Since the fence we are building will be more traditional-picket, with air space between the pickets, and the fence we salvaged was solid, we have twice as many to think about as we need for the same distance.

Plan
diggin holes
Boo and I spent a Saturday morning, wandering around with coffee, measuring tape and a level to decide where to put our fence. We have a power meter on the house, so that needs to be available to the power company. That defined the furthest towards the street it could go. Less than a foot further back, is the downspout. We preferred having that in the backyard, so the fence is going into that spot in between. There is a small flower garden there, and then open space to the neighbor's fence. We intend to put a garage in the back one day, and we would like to be able to pass through without having to open a big ol' gate to do so. To remedy, we decided to have a short section of fixed fence from the house to the edge of the flower garden. There, we would put a 1 meter person gate. The rest of the line from that gate to the neighbor's fence would be a 4 meter opening, with 2 2-meter gates so a car could pass between. The weight of the person gate should be relatively small, and with the hinge on the flower garden side, there will be sufficient ballast. The car-gates, however, cannot be free-swinging gates. I figure that no matter how deep I set the post between the person gate and the adjacent car gate, that car gate will pull on it and eventually loosen it. So, the car gates will get wheels.

Prep Material
this took a long time
Free wood is not as "free" as it sounds. Each picket needs to be removed from the cross-pieces, the screws and nails removed and then cut to length. I started simply by removing pickets and the fasteners from the pickets and cross-pieces, leaving them in corresponding piles. I spent spare cycles around work days and other commitments to collect a pile of pickets nearly 3 feet high and twice as wide. This took a lot longer than I expected. We borrowed a table saw to rip the boards down from their existing 5 inches wide down to 3 inches wide. Again, this creates an opportunity to cut off splits or bad edges. But each board takes multiple cuts (up to 4, right?) to get right. We delayed the shaping of the pickets until after we got some of the fence supports up.

For posts, we had a couple of long pressure-treated 4x4 posts already on the property. For the 3rd post, we took the best-looking, longest from the salvaged fence. It was also pressure treated and look less than a couple of years old.

Dig Holes, Place Poles
holes dug
With a rough plan in place, we got into details, marking exactly where each post would go. Once satisfied, I marked the spot with spray paint. To collect the dirt, I laid out a tarp. We had an old post-hole digger, but it would not make much of a dent in the clay soil. Instead, I started with a traditional shovel, removing the top layer, tossing the dirt under the grass-plug onto the tarp. Once I got down to the top of the shovel (6 inches?) I switched to a pry-bar to loosen the clay and then a small plastic tub from the recycling to remove the loosened soil. In this manner, I dug 3 holes 24 inches deep, each taking about an hour. While I was digging, Boo went out and got us 10 gallons (2 5-gallon buckets full) of 3/4-minus gravel.

One post at a time, we put a few inches of gravel in the bottom of the hole, tamped it with the fence post and then set the post in place. Boo confirmed vertical with a level on 2 sides while I added gravel and tamped over and over again until the post was secure. After the first post was set, we also checked that the placement within the hole was in a straight line and then followed the same vertical / gravel / tamp cycle. Once all 3 posts were in, we watered the holes to press out the air, and then added more gravel and tamped again. We topped the last 1/2 inch of the hole with soil and then made sure there was a mound around the post, again tamping. In theory, this should dissuade rain from running down along the post, weakening the foundation. We will see.

I took a few weeks of work around work to get this far. We have steel brackets for building the gates so they will not only be held together with wood 2x4's and wood screws. I will get after that assembly and more material prep in the next post.

Thanks, as always, for following along-

Tuesday, June 13, 2023

Car-go-round

As we hit Summer, I find my attention going in 100 directions at once. When you have many cars, each with small problems, and a house in mid-rehab, that scatter is probably that much worse. With the rehab work going on, I will have limited time to work on cars, but Boo has asked me to think about setting aside one day a week to it since I take such pleasure from it, and life can't always be about to-do lists, home construction and your job. So, today's post tries to bring some order to the car-chaos, with a hope that I will have some time to clown on one or more of these open items this summer.

Oliver
Oliver is the 1978 MGB. Some may look at Oliver like he was my mid-life crisis car. In truth, he was a car that could fit in the super-small garage I had and needed work. He was something I could work on that wasn't Hapy, the 1972 VW bus, and I could be out of the rain when I did it. Oliver definitely met that goal and I really needed something other than Hapy to wrench on for a while. The goal Oliver has not yet met is passing DEQ. So, he is not legally drive-able. Oliver's list of incomplete items is fairly short, though. I believe, he could pass DEQ today if the carb is adjusted right. He just needs another run through DEQ to see how close I am. He got a new battery for the move to the NewOldHouse, and since then he has sat under one of those 5L car covers with the battery disconnected.

Beyond DEQ, the heated seat circuit did not get completed, and there remains a leak under the windscreen on the passenger side. Perhaps most importantly the brakes are still spongey and I think it is because the brake master cylinder was not bled prior to install. I asked the guys at Les Schwab to do it when I bought a set of tires from them. They sold me the tires, failed to bleed the brakes, and that's why I now buy tires at Firestone. Anyway, I bought a brake bleeder kit, (and will document my process) and hope to get him to DEQ before this top-down season has really started.

Zed
Ah Zed, the 1978 Datsun 280ZX. After a spring and summer of bodywork, Zed still needs a lot. I won't rerun that history, but there was a lot of sanding and shaping. Then, I had that heroic drive from oldHouse to NewOldHouse, sitting on a toolbox for a front seat (See Zed Moves). Once parked, he got a 10x20 to sit under while we worked on the house. Well, the weather had other plans, lifting and tossing the canopy multiple times, putting multiple rubs and deep scratches into the paint (See Hello Windstorm, My Old Friend). So, Zed will need another round of sanding and painting. Now that I have seen the Eastwood 9mm in the sun, I am not as enamored with it. I see a slight olive green in that dark grey and the pitted finish is not to my liking at all. So, I will probably sand down below the paint to some degree, re-shoot the black primer and shoot a different color. Of course, the body kit is installed and it's not coming off. So, I will need to get creative to get good coverage down low. Now parked next to Oliver with a matching 5L car cover, they are twins. I do not expect to do much of anything on Zed this Summer.
 
Hapy
In the Phil and Friends post (See Phil and Phrends Road Report), I mentioned a few things that needed attention before the next drive in Hapy, the 1972 VW camperbus. The most glaring was the loss of the brake booster. I removed the hose from the booster and tested the vacuum on the booster unit. I applied 15 pounds of vacuum and over the course of a few minutes, it decayed a couple of pounds. To me, that is satisfactory. Then, I tested the vacuum on the hose I had just removed. It held no vacuum. So, I acquired and installed Gates vacuum hose. One quick test drive later, the brakes are good. I installed the cage for the stereo so it is well locked into the glove box install location. I also affixed a mount for the UltraGauge on the steering wheel support so the UltraGauge is directly below the speedometer now. I do not expect Hapy will have meaningful work done to him for the rest of the Summer. Instead, he will be set up for DrivewayFest between trips so we can enjoy our clubhouse-on-wheels. Hapy has been used a few times since we moved as my daily-driver when Boo needs to take Toyotruck somewhere. Every time, since we moved to the NewOldHouse, he has started right up. I mentioned the saga about towing him here. The starter swap-out was easy and the right fix (See Hapy Lives Again).

Nemo
Nemo (1997 Audi A4 Quattro) has left the fleet, enjoying a new lease on life in Idaho. See Fare Well, Nemo.

GoRo
GoRo (2009 Audi A4 Quattro) had a series of issues appear over last winter. First, the outer driver handle stopped working. So, to get in, you needed to reach through either from the passenger side or from the rear seat to get the door open. What a pain. Then, the battery started to misbehave, not holding charge. While looking for the charger studs, the hood latch broke. So, GoRo sat for most of the winter, until Boo got the hood latch repaired (she hired our friend Courtney at MobilePDX). Even Courtney doesn't want to touch the outer door latch, so we're not sure what we are going to do about that. I need to get the battery replaced, and then maybe I'll take it on. Either way, we are going to sell GoRo. We figure it hasn't been driven since last December, and we have been just fine without it.

ToyoTruck
Recall that Boo and I bought ToyoTruck (2005 Toyota pickup) from her sister. We had agreed to the price before the ice-storm sent the truck into a pole, damaging the passenger front corner. I replaced a bunch of things, but did not shoot the paint. The top of the truck has suffered sun, wind or seaside damage to the paint as well, so when I paint the replaced bodyparts, the top half of the truck (at least) needs paint as well. This truck has minor dents on a few panels as well, so before I shoot anything, I'll work those dents out first. ToyoTruck is our true daily-driver. I hope, once GoRo is gone, and Oliver is legal, perhaps we will drive Oliver and Hapy around, leaving the truck home more.

When I can get away from house construction projects, I will be getting after this stuff, starting with Oliver. He is such a fun ride, and it would be a shame to lose another Summer to something like DEQ. I know I have not been posting much, basically since we bought this house. That day, car work mostly came to a halt, and house construction is much slower and frankly less interesting to post on. I will make me next post a catch-up on what's happened here since my April post.
Thanks, as always, for following along-

Tuesday, April 18, 2023

Tear This Old Kitchen Down

If I had my way. Yeah, if I had my way. If I had my way, I would tear this old kitchen down. Boo and I have been singing that little tune (a take on Samson and Delilah) since we bought this old farmhouse last August. Well, we took a huge leap forward. So, today's post covers it, starting with where it all began.

How We Found It
"One day while Sampson was walking along, looked down on the ground, saw an old jawbone". In many ways, the NewOldHouse kitchen was a skeleton when we purchased the house. The guy we bought the house from had started the demo when Boo worked out the purchase arrangement. The doors and drawers were gone, the stove and fridge were gone and some of the uppers had been smashed. Oh, and it was filthy. It was the most disgusting kitchen I had ever seen.

First Round
during first round
Before I picked up the sledgehammer, Boo removed the remaining garbage that could be seen and then rough-cleaned the floors, walls and ceiling. By rough-cleaned I mean with a floor mop she would wash until the water turned gray and then repeat until she was so sore she couldn't anymore. That got rid of most of it to the point where we could go in there and not feel like we were in a bacteria-laden petri dish. Regardless, we continued to wear rubber gloves and dust masks.

I started with the garbage disposal, simply disconnecting the sewer line, the electrical and then from the bottom of the sink. The disposal looked hardly used, so thinking we will probably re-use it, I stashed it in the garage. Next, Boo and I removed the dishwasher. I was surprised by how little in terms of fasteners are used to hold a dishwasher in place: 2 screws along the front, holding the leading edge to the underside of the counter. Once we started pulling it out, however, we encountered more garbage. We threw our respirators back on and completed the yank into the middle of the kitchen floor. The insulation around the dishwasher smelled like human urine and there was more rat evidence behind it. So yuck. The dishwasher went into the to-the-dump heap, and the garbage went into the weekly street bin.

oh my gross
Feeling fully grossed, I shifted to the upper cabinets. We lacked a power driver that could remove the 3" long mounting screws driven into the studs. So, my method was a little more smashy: crush the cabinets with a sledge until they fell off the wall in pieces. Then, I would chisel around the screws in the rear wall until the real panel fell off. I removed the screws by loosening them with a framing hammer and then hand turning them out. Unfortunately, this gave me tennis elbow in my left arm that 5 months later I am still recovering from and I still didn't get all the screws out of the walls. Still, the uppers came out, went to the landfill pile and then on to the landfill about a month ago.

Sledgehammer Triumphant Return
Once the old house was fully vacated and repairs completed, we were ready to refocus on the kitchen at NewOldHouse. Since both Boo and I are suffering from tennis elbow, we splurged on a DeWalt power driver for removing the screws, and I tried it out on the screws remaining from round 1. Then, we teamed up on removing the iron sink into the garage (will probably reuse with a new fixture) and then removing the counter tops. The counter tops were glue-board with a thin Formica veneer that were attached to the base cabinets with construction adhesive, so they removed once I convinced them to... with the long-handled sledgehammer. It surprised us both how much smell this glue-board stuff retains. Clearly, once the rats get in, there is no escaping the smell they create without considerable effort.

The power driver made the removal of the base cabinets much easier than the uppers were: remove the screws and then pry the cabinets apart with a wrecking bar - the base cabinets had construction adhesive between them. Boo and I removed them from the wall and then out to the landfill pile one at a time. Of course, just like we had a discovery under the dishwasher, we had guh-nasty discoveries under the cabinets along that wall (see picture on the right). Again, once the gross was discovered, respirators went on and the mess was cleaned up.

UnFlooring
flooring coming up
With the cabinets gone, we swept the floor, washed up and grabbed a late-afternoon sandwich. Boo noticed that the linoleum that had been under the cabinets was curling up along the wall. So, with safety equipment back in-place, she started pulling up the linoleum flooring, but her arms (tennis elbow) stopped her after a few minutes. Curious about what lay beneath, we lifted some of the plywood underneath to reveal the original wood flooring. We had been concerned that perhaps there was old tiling (and possible asbestos), but were delighted with original, but damaged, wood floor. So, with a 1-meter wrecking bar, I set to lifting the plywood and linoleum together. As the wood split into pieces Boo collected the debris out to the landfill pile. In a couple of hours, the linoleum and plywood were gone. We swept up and called it "good enough" for the day. Many nails remain stuck into the old flooring, so we will be pulling nails before we can wet-mop the gross-dust on the floor. Between then and now, Boo intends to run our "for nasty things" vacuum on the floor to lift out as much of the dust as she can. For now, we have laid down old carpet on top of the floor so we don't track that dust into the main living space.

done for today
We were fortunate to have a dry relatively-warm weekend day to do this work. We had the windows open, the music playing and got more of the job completed than I think either of us expected. We are thrilled to see that the original floors are there. From this last picture, you can see that the flooring under the sink had probably become damaged as the flooring was replaced with what look like old cabinet doors and drawer faces. Since this will again reside under cabinets, it would not be necessary to finish that area with hardwood. I expect we will replace the hack-job with real water/rot resistant sub-flooring instead. Tuukka was our Safety Agent, making sure we stopped frequently for water and petting breaks. At the point of this picture, he was telling us the workday was over, and now it was time for his dinner. We agreed.

Thanks, as always, for following along. This was not technically difficult, and it wasn't really all that physically challenging until we got to the flooring. For that, I was sweating like it was summer and breathing hard. I cannot wait to get the nails out and see what this flooring looks like after a good mop. Knowing that we will be expanding the doorway into the main living space, we may find that the flooring needs some replacement, but we'll deal with that if/when it happens.